// 4 Dispatches
Lolwe AI infrastructure layer complete. Registry-driven. Truth Standard enforced.
Phase 3 of the LLW infrastructure layer ships: 12 typed registries, evidence taxonomy (framework→pilot→verified→scaled), 25 dead components removed, Knowledge Bank restructured, EvidenceBadge live across all surfaces. Every entity now carries an explicit evidence level. Nothing defaults upward. Hackathon Radio broadcast data populated — NowBroadcasting widget is live on lolwe.co.ke.
lolwe.co.ke/knowledge →KONA Node 000 pilot: 90 days active. Case study in progress.
DEP-001 — KONA at Hopra Ventures, Nyamira. Machines installed. POS system built and running. WhatsApp interface behind schedule. Documentation in progress via Makairo Studios. Metrics will be confirmed when the case study concludes. No metrics published until confirmed.
lolwe.co.ke/case-studies/kona-hopra →Hackathon Radio is live. 34-track builder broadcast. Always on.
The broadcast clock is running. Every listener worldwide hears the same second. No streaming server. Pure math. Nam Lolwe opens the loop. #Road2MandelaBay closes it. The Republic is on air.
rebootrepublic.com/#transmission →Mission 001 dispatched. Builder mobilisation active.
The Republic surfaces Mission 001: FNB App Academy. Build an app. Document the build. The builders who complete this mission become nodes in the network.
rebootrepublic.com/missions/mission-001 →// Submit a Dispatch
Dispatches must be: one clear point, builder-relevant, linked to evidence. Not plans presented as completed work.
Categories: mission · deployment · knowledge · radio · repository
Read SUBMIT_DISPATCH.md →// Signal over noise. Evidence over claims.